Industrial Steel Detailing Projects
When planning structures for such diverse groups as shoppers, students, tourists, conventioneers, and people simply having fun, the design process can be challenging. That's why construction professionals turn to MKE Steel Detailing to produce fast, accurate (to at least 1/16”) structural drawings, 3-D models and Building Information Modeling (BIM) files. They know the MKE Steel Detailing team will develop creative solutions to every challenge along the way.
Museum of Glass, Tacoma, WA
60 tons of steel
General Contractor: Baugh Construction
Fabricator: Jesse Engineering
Project Description: Tacoma's world renowned Museum of Glass features a cone which houses the museums "hot shop amphitheater". Amphitheater visitors watch live glassblowing demonstrations. The landmark cone reaches an interior height of 90 feet. |
Click for larger images
|
|
|
Seattle University Sky Bridge, Seattle, WA
100 tons of steel
General Contractor: Baugh Construction
Fabricator: United Iron Works
Project Description: Pedestrian sky bridge at Seattle University. |
Click for larger images
|
|
|
Escala, Seattle, WA |
Project Description: 30-Story luxury residence tower in downtown Seattle. |
|
|
Snoqualmie Casino, Snoqualmie, WA |
1800 tons of steel
Fabricator: Canron
Project Description: 170,000 sq foot complex including gaming, restaurants, clubs, entertainment and concert facilities. |
|
|
Lincoln Square, Bellevue, WA |
Project Description: Lincoln Square is a 1.4 million sq foot mixed use building. Includes 310,000 sq feet of retail space, 337 Westin Hotel rooms, 148 private residences and 5 underground parking levels. |
|
|
Benaroya Hall, Seattle, WA |
1800 tons of steel
General Contractor: Baugh Construction
Fabricator: Graham Steel
Project Description: Comprising an entire city block, Benaroya Hall is home to the Seattle Symphony and features two performance halls. |
|
|
Showare Center, Kent, WA |
Project Description: Home of the Thunderbirds hockey team with seating for 7,300. ShoWare Center is North America's first sports and entertainment arena to achieve LEED Gold certification. |
|
|
Little Creek Casino, Shelton, WA |
Project Description: Casino complex including gaming, resort, meeting and convention facilities. |
|
|
Airdustrial, Tumwater, WA |
400 tons of steel
Fabricator: Olympic Iron
Project Description: industrial expansion. |
|
|
SCORE South Correctional Entity Multijurisdictional Misdemeanant Jail Project, Des Moines, WA |
Project Description: The South Correctional Entity, currently under construction, will house up to 822 inmates from the cities of Auburn, Burien, Des Moines, Federal Way, Renton, Seatac and Tukwila. |
|
|
Request a quote or contact us today to discuss your industrial construction project.
|
| | | | | |
MKE Steel Detailing, LLC
(206) 783-4600
Meetings and conferences by appointment only
6100 219th Street SW, Suite 480, Mountlake Terrace, WA 98043
© Copyright 2009 -
, MKE Steel Detailing, LLC All Rights Reserved.
Website Design, Hosting and Maintenance by New Tech Web, Inc. |
|
Seattle University Sky Bridge, Seattle, WA
Museum of Glass, Tacoma, WA
|
|